I’ve been quiet on the blogging front, but I’m back now that there’s little for me to do during the concrete forming process. Read on for a quick photo tour of our progress… Since the last post we’ve had the hole for the shop dug out shop hole with four dump trucks running all day moving the soil to a family’s house to fill in a hole for the kids to have a soccer field. dumping dirt Then the footings were formed up forming shop footings the rebar was added rebar - shop footing and then the footings were poured pouring the shop footingsThat brings us up to present with the rebar being tied in for the stem walls. stem wall formskim tying in rebar for the shop walls